Construction of structures for Interchange and Widening of 5.0 km Port access link road for MPSEZ.
The project consists as under :-

Total Length of Bridge : 1101.78 m including North side approach length 13 spans of 20.0 m &
239.14 m RE wall. In Railway portion total length of bridge 92.92 m consists 4-spans in south side
approach, 14-spans of 20.0 m and 229.72 m RE wall, Total length 509.72 mt.

The width of the bridge 19.50 mt in Phase-I & II. Type of foundation is 1200 mm dia pile foundation
with RCC substructure, POT-PTFE bearing RE wall. Superstructure is precast pretention PSC Girders in
approaches and PSC cast is situ box type superstructure in railway portion.

SERVICES PROVIDED :

• Planning of the Project
• Estimating of the work
• Preparation of specification for work, project implementation contract administration
• Periodical construction supervision & advisory services during construction to sole problems
during construction with consultation to MPSEZ.

TEAM ASSIGNED :

Mr Apurva N Parikh– Team Leader
Mr H.M. Trivedi – Senior Bridge Engineer
Mr B N Suthar – Senior Bridge Engineer
Mr. N. B. Shah – Senior Highway Engineer

Client Name

Mundra Port and Special Economic Zone Ltd

Estimated Cost

Rs. 450 Million