The length of the project is 131.50 Km. The scope of work will broadly include rehabilitation, up- gradation and widening of the existing carriageway to four/six lane standards with construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains, etc. and the operation and maintenance thereof.

SERVICES PROVIDED :

Proof checking of structural designs for the structure to be constructed for 4/6 laning of NH-6 in Gujarat State prepared by the consultant of concessionaires.

TEAM ASSIGNED :

Mr Apurva N Parikh– Team Leader
Mr B N Suthar – Senior Bridge Engineer

Client Name

NATIONAL HIGHWAY AUTHORITY OF INDIA

Estimated Cost

Rs. 0.5 million