Gujarat State is a water scarce state and has vast variation in rainfall in its own regions; several parts of the State face floods during monsoon, at the same time several parts are drought affected. The Saurashtra region is scarce in its water resources thereby affecting its overall development.

The Gujarat Government has decided to augment various reservoirs of Saurashtra region by construction of pipe line /feeder canals. The entire project is named as “Saurashtra Narmada Avtran Irrigation Yojana (Sauni Yojana)”. The entire work have been planned to be executed in different links in phased manner. Out of these 4, EPC contract for one link (Link -2, Package-3) Limdi Bhogavo II to Raidy was awarded to SPML infra limited and (link 4- Package – 2). Limdi Bhogavo II to Hiran II was awarded to ESSAR Projects. We M/s. Multi Media Consultant Pvt. Ltd. are awarded as design consultant for civil, electrical, mechanical & instrumentation works for preparation of detailed designs, working drawings and as build drawings of 3000 mm dia meter M.S. twin pipe.

SCOPE OF WORK :

Link -2, Pakage-3 is from Intermediate Pumping Station (Ch. 30.9 km) to Bhimdad reservoir situated at approximate length 20.386 km. The scope of work is preparation of detailed designs, working drawings and as build drawings of 3000 mm dia meter M.S. twin pipe each of 20 km length.
Link -4, Pakage-2 is from Intermediate Pumping Station (Ch. 18.317 km) to Intermediate Pumping Station near Goma reservoir situated at approximate length 19.183 km. The scope of work is preparation of detailed designs, working drawings and as build drawings of 3000 mm dia meter M.S. twin pipe each of 40 km length.

TEAM ASSIGNED :

Mr Apurva Parikh – Structural Engineer
Mr. Krutik Shah – Structural Engineer
Mrs Rekha A. Shah – Hydraulic Engineer
Mr. Nilesh Parmar – Quantity Surveyor
Mr. Nishidh R. Shah – Water Resource Management Expert
Mr Roshan Shah – Sr Elec/Mech/Inst Engineer

Client Name

SPML INFRA LTD. / ESSAR PROJECT INDIA LTD

Estimated Cost

Rs. 25 Million