AMC has proposed to construct Railway Under Bridge at Kubernagar ITI across Ahmedabad – Udaipur M.G. Railway line between station Naroda & Dahegam at Ahmedabad. RCC box is to be pushed under the railway portion and approaches joining to the existing road on both sides. Detailed Design and working drawing of box thrust bed, thrust block and cutting edge, approach with U-wall & retaining wall with open foundations. Total length of approach portion is 164.14 m including U-wall in railway portion & solid slab bridge on service road parallel to the railway line on Kotarpur side approach. On Naroda side approach RCC U-wall on open foundation, length is 29.22m. approach portion of 80 m is rested on 1000 mm dia continuous pile & remaining 52.14 m approach on 900 mm dia continuous pile. Total length of approach on Naroda side is 161.36 m

SERVICES PROVIDED :

  • Detailed Project Report
  • Survey work
  • Preparation of GAD & Cost Estimates
  • Approval of GAD & Detailed Design & working drawings of box thrust bed & thrust wall & cutting
    edge as per GAD alignment return on pile foundation, got approved from railway authority.
  • Preparation of Tender document including specifications.

TEAM ASSIGNED :
Mr Apurva N Parikh– Team Leader
Mr B N Suthar – Senior Bridge Engineer
Mr H.M. Trivedi – Senior Bridge Engineer
Mrs. Ghatna Vasavda – Structural Engineer

Client Name

Ahmedabad Municipal Corporation, Ahmedabad

Estimated Cost

Rs. 10.9 Million