Cable Stayed Bridge Bhavnagar Gujarat India

Client: R & B Department Government of Gujarat

Project Summary:

Construction of a NEW HIGH LEVEL CABLE STAY BRIDGE two lane with footpath at Bhavnagar Creek by R&B Department Government of Gujarat.

Total length of bridge is 384.30 m consisting length of bridge portion is 180, Bhavnagar side approach 101.90 m & Nirma side approach 102.4m. Total width of bridge is 16.0 m having with clear carriageway 11 m, two crash barrier of 0.5m, footpath 1.65 m & parapet 0.35 m on both side.  RCC deck for pier segment and back span in m:45 concrete.

 

Description of Actual Services provided by the Firm:

MMCPL was assigned following duties for this Project:

  • Preparation of Detailed Design and working drawings for all bridge components with support from Freyssinet CIE,France
  • All Design and working drawings got approved from Design R&B Circle, R&B Department Government of Gujarat, Gandhinagar.
  • All Detailed Design working drawings completed & have been approved by SE Design R&B Circle, Gandhinagar

 

Team Assigned:

  1. Mr. Apurva N. Parikh – Managing Director – MMCPL
  2. Mr. B.N. Suthar           – Senior Consultant
  3. Mr. H.M. Trivedi          – Senior Consultant
  4. Mr. Dhrumil Parikh – Design Engineer

 

Project Cost: Rs. 279 Million